← TSD Design.ca
Prepared for Jane Homeowner · Victoria, BC

Kitchen
Remodel
Project Proposal

Here is where your remodel begins.
Jane’s new kitchen — after render
Project login TSD-2026-0826Bookmark to return to your latest proposal
01
Contents

What’s inside.

01Design & styleJC Scott02CabinetryUrbana Kitchens03CountertopsColonial Countertops04FlooringIsland Floor Centre05AppliancesLansdowne Gallery06FixturesSplashes07FurnitureInsideOut Homestore08ElectricalNorthern Star09PlumbingMilani10General contractorAzbowa Homes11Project costingQuotes received so far12Virtual tour360° walk-through13–20Plan setAppendix · plan & elevations21What happens nextStages & sign-off22CalendarConstruction from Mar 1, 2027
02
Before & after

One layout, and the look she chose.

Jane tried her kitchen in teal and granite in the AI Showroom first, then settled on white Shaker with a navy island — and that is the design drawn up in 2020 Design. Same room, same angle, so every pro quoting the work sees exactly what she’s after.

The same kitchen restyled in teal in the AI Showroom
First look
restyled in the AI Showroom
After
Final design
Jane’s 360° design, rendered
Your selections

Everything Jane has chosen to get quoted.

Each request Jane makes on the site drops into this proposal as its own chapter. Open any one for the full specification — right down to the handles — and the local pro who’ll quote it.

01 · Design & style

Design & style Modern Shaker White — designer-led.

Jane’s kitchenJane’s kitchen

Their quoteAwaiting

A bright, refined take on Jane’s kitchen: crisp white Shaker cabinetry, a navy island under white marble, brass pulls and polished-chrome tapware.

  • Modern Shaker White
  • Warm white · white marble · navy island · brass
  • Full kitchen — design, 360° walk-through, renderings & coordination
  • JC Scott, Victoria
JC Scott · Victoria, BC →
01
02 · Cabinetry

Cabinetry Shaker doors · White & navy · frameless.

Jane’s kitchenJane’s kitchen

Quote received$38,000

Frameless custom cabinetry in painted white with a navy island and brushed-brass pulls, soft-close throughout, built to Jane’s measurements.

  • Kitchen
  • Frameless (full-access)
  • Fully custom
  • Shaker
  • Painted · White (perimeter) · Navy (island)
  • Plywood box, white melamine interior
02
03 · Countertops

Countertops Natural stone · white with grey veining · two-tier island.

Jane’s kitchenJane’s kitchen

Quote received$9,200

A soft white marble-look stone with grey veining across the perimeter and the two-tier island, honed and undermount-sinked.

  • Natural stone (marble-look)
  • White with soft grey veining
  • Honed
  • Eased / square
  • 3 cm — mitred to 6 cm on island
  • Yes — two-tier, seating side raised
03
04 · Flooring

Flooring Wide-plank natural oak · matte.

Jane’s kitchenJane’s kitchen

Their quoteAwaiting

Wide-plank engineered natural oak in a matte finish, laid to flow into the adjoining rooms.

  • Engineered hardwood
  • White oak
  • Natural
  • Matte
  • Wide plank (7½″)
  • Straight lay
Island Floor Centre →
04
05 · Appliances

Appliances Integrated package · 6 pieces, brand-specified.

Jane’s kitchenJane’s kitchen

Quote received$22,500

A coordinated, integrated appliance package — each piece specified to type, size, brand and finish. Open the spec for the full schedule.

  • French door · built-in · 36″ · internal ice & water · Sub-Zero · panel-ready
  • Induction · 36″ · single oven · Wolf · stainless
  • Under-cabinet · 36″ · ducted · Vent-A-Hood · stainless
  • Panel-ready (integrated) · extra-quiet
  • Drawer · 27″ · Electrolux
  • 24″ · built-in · Sub-Zero · panel-ready
Lansdowne Appliance Gallery →
05
06 · Fixtures

Fixtures Polished chrome tapware · undermount sinks.

Jane’s kitchenJane’s kitchen

Their quoteAwaiting

The working hardware — polished-chrome tapware, faucets and undermount sinks that finish the room.

  • Polished chrome
  • Pull-down, polished chrome
  • Polished chrome
  • Undermount stainless (2)
  • Wall-mounted, chrome
Splashes Bath & Kitchen →
06
07 · Furniture

Furniture Upholstered counter stools · dining set.

FurnitureFurniture

Their quoteAwaiting

The pieces that make the kitchen livable — island seating and a dining set, in tones that pick up the cabinetry and stone.

  • 3 upholstered counter stools
  • Round, natural oak
  • 4, woven / upholstered
  • Brass étagère / bar cart
InsideOut Homestore →
07
08 · Electrical

Electrical Matte-black cone pendants · layered lighting.

Jane’s kitchenJane’s kitchen

Their quoteAwaiting

Three matte-black cone pendants over the island, with task, ambient and in-cabinet accent lighting on separate controls.

  • Three matte-black cone pendants over island
  • Recessed, dimmable
  • Under-cabinet LED
  • Zoned & dimmable
  • Dedicated: range, fridge, dishwasher, island
Northern Star →
08
09 · Plumbing

Plumbing Sink & dishwasher lines · pot filler at range.

Jane’s kitchenJane’s kitchen

Their quoteAwaiting

Rough-ins set to the new layout with a pot filler at the range, pressure-tested before close-up.

  • Sink, dishwasher, fridge water line, pot filler
  • 2 sinks
  • Pressure-tested before walls close
Milani Plumbing →
09
10 · General contractor

General contractor Demolition through finish · coordination.

Jane’s kitchenJane’s kitchen

Their quoteAwaiting

One team keeping the trades sequenced, the site clean and the schedule on track.

  • Demolition, framing, drywall, paint
  • Day-to-day site management & scheduling
  • Sequenced across all partners above
Azbowa Homes →
Your request · TSD-GC-0826Review / edit →Their quote · pending
10

Figures shown are working placeholder estimates. Final pricing is confirmed with each partner after Total Spaces Décor reviews the proposal.

Project costing

The whole project, added up.

This total builds itself. As each pro returns their quote, its price drops in here and the number climbs. Right now 3 of 10 quotes are in — the rest are still out.

01Design & stylePending
02Cabinetry$38,000
03Countertops$9,200
04FlooringPending
05Appliances$22,500
06FixturesPending
07FurniturePending
08ElectricalPending
09PlumbingPending
10General contractorPending
Received so far · 3 of 10$69,700

Live total — reflects only the quotes received so far. It updates automatically as the remaining 7 come in.

11
TSD 360° Design · Delivered

Walk through your kitchen — before it’s built.

Jane’s design has been produced as a full 360° walk-through — the same kitchen shown on every page of this proposal, turned into an immersive view she can open in any browser or on her phone. Look up at the pendants, down at the floor, all the way around the island. It’s the closest thing to standing in the finished kitchen before the first cabinet is hung.

Jane’s kitchen — 360° walk-through
360°Tour
Drag to look around · works on any phone
Experience your design in an immersive headset
Open it in a headset — or right in your browser
Look in every directionA true walk-through — ceiling to floor, wall to wall, all the way around.
Open on any deviceJust a link. Works in any browser and on your phone — no app, no headset needed.
Built from real drawingsA dimensioned plan and elevation set comes with it, so every pro quotes from the same drawings.
12
Appendix · Plan set · 13–20

Drawn to build from, not just to look at.

Jane’s floor plan and six dimensioned elevations, with cabinet codes, as produced for the 360° design. These are the drawings each trade quotes from.

13
Floor plan
Floor planTSD-2026-0826 · Plan set · 2020 Design · page 14
Elevation — window wall
Elevation — window wallTSD-2026-0826 · Plan set · 2020 Design · page 15
Elevation — range wall
Elevation — range wallTSD-2026-0826 · Plan set · 2020 Design · page 16
Elevation — fridge wall
Elevation — fridge wallTSD-2026-0826 · Plan set · 2020 Design · page 17
Elevation — island, sink side
Elevation — island, sink sideTSD-2026-0826 · Plan set · 2020 Design · page 18
Elevation — island, seating side
Elevation — island, seating sideTSD-2026-0826 · Plan set · 2020 Design · page 19
3D plan view
3D plan viewTSD-2026-0826 · Plan set · 2020 Design · page 20
What happens next

From draft to doorstep — and what you sign along the way.

Seven stages take Jane’s kitchen from this proposal to a finished room. Each stage ends with one sign-off, so nothing is ordered, built or paid for without her approval. Dates are approximate and are confirmed with each partner as quotes come in; construction is planned to start Monday, March 1, 2027.

StageWhenWhat you sign
1Design approvalThe 360° design, floor plan and elevations.Sept 2026Design sign-off — layout, finishes and the plan set locked
HomeownerDate
2Quotes & selectionsAll ten trade quotes returned; final product selections.Oct – Nov 2026Selections & budget approval — the project costing (11)
HomeownerDate
3Agreements & depositsContracts with each partner; deposits placed.Nov 2026Trade agreements and deposit schedule
HomeownerDate
4Ordering & permitsCabinets ordered (8–10 week lead), appliances reserved, permit filed.Dec 2026 – Jan 2027Cabinet shop drawings; appliance schedule; permit application
HomeownerDate
5Pre-constructionSite walkthrough, protection plan, schedule confirmed.Feb 2027Construction schedule and site-readiness checklist
HomeownerDate
6ConstructionDemolition through finish, sequenced by the general contractor (calendar below).Mar 1 – May 27, 2027Progress sign-offs at rough-in, cabinet install and countertop install
HomeownerDate
7CompletionFinal walkthrough, deficiencies cleared, warranties handed over.May 28, 2027Completion certificate; holdback release
HomeownerDate
Jane Homeowner · proposal acceptedDate
Total Spaces Décor · project coordinatorDate
21
Construction calendar

Twelve weeks, start to finish.

Working days are colour-coded by phase. Weekends and statutory holidays are left clear; the general contractor confirms the exact sequence once the cabinet delivery date is set.

March 2027

MTWTFSS
1Start
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26Good Friday
27
28
29Easter Monday
30
31

April 2027

MTWTFSS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

May 2027

MTWTFSS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24Victoria Day
25
26
27
28
29
30
31
Demolition & disposalRough-in plumbing & electricalRough-in inspectionsDrywall, prime & paintFlooringCabinet installationCountertop template & fabricationCountertop installFinish plumbing, electrical & backsplashAppliances & fixturesDeficiencies & cleanFinal walkthrough & sign-off
Demolition & disposalMar 1 – Mar 5
Rough-in plumbing & electricalMar 8 – Mar 19
Rough-in inspectionsMar 22 – Mar 23
Drywall, prime & paintMar 24 – Apr 6
FlooringApr 7 – Apr 13
Cabinet installationApr 14 – Apr 23
Countertop template & fabricationApr 26 – May 7
Countertop installMay 10 – May 11
Finish plumbing, electrical & backsplashMay 12 – May 19
Appliances & fixturesMay 20 – May 21
Deficiencies & cleanMay 25 – May 27
Final walkthrough & sign-offMay 28
22
Total Spaces Décor · Personalized Project Proposal · Sample · TSD-PR-0826-JANE